      OUR SPECIFICATIONS

      Our assets meet a minimum base build specification:

      FM2 floor (TR 34 4th edition, with a load-bearing capacity of 90Kn/m²)

      15.5m clear springing / eave height

      Warehouse perimeter walls constructed using tilt-up panels

      No plaster or paint to external walls of offices

      Insulated Sectional Doors with Viewing Panels

      Kelley dock-levellers (imported from the USA and locally assembled)

      One battery charging bay per 1,000m² of GLA

      7m canopies over dock loading doors

      18m canopies over on-grade doors

      Concrete Yard depth minimum 45m to the face of the warehouse.

      Pumps and Tanks

      FM2 floor (TR 34 4th edition, with a load-bearing capacity of 90Kn/m²)

      15.5m clear springing / eave height

      Warehouse perimeter walls constructed using tilt-up panels

      No plaster or paint to external walls of offices

      Insulated Sectional Doors with Viewing Panels

      Kelley dock-levellers (imported from the USA and locally assembled)

      One battery charging bay per 1,000m² of GLA

      7m canopies over dock loading doors

      18m canopies over on-grade doors

      Concrete Yard depth minimum 45m to the face of the warehouse.